The City of Chandler desired to create a public project which could make use of the excess capacity of its waste water treatment plants. Using a series of pumps and retention basins, the Chandler Heights Recharge Project utilized treated waste water to create natural riparian preserves while replenishing the existing underground aquifer. Coupled with hiking trails, a six-acre man made lake, and an education center, CHRP allows local residents to experience the way in which water is cyclically placed back into the ecosystem. A 80,000 sf police substation was also constructed on site as a way to bring public transparency to local law enforcement.
![](https://static.wixstatic.com/media/7ec670_3d3fb405113fa5e725dafd650ea20ce1.jpg/v1/fill/w_960,h_720,al_c,q_85,enc_auto/7ec670_3d3fb405113fa5e725dafd650ea20ce1.jpg)
![](https://static.wixstatic.com/media/7ec670_09c7485e9d54f9e84745b32d26d0ab65.png/v1/fill/w_980,h_597,al_c,q_90,usm_0.66_1.00_0.01,enc_auto/7ec670_09c7485e9d54f9e84745b32d26d0ab65.png)
![](https://static.wixstatic.com/media/7ec670_83896661080ef347a2c0425c17b1c62d.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/7ec670_83896661080ef347a2c0425c17b1c62d.jpg)
![](https://static.wixstatic.com/media/7ec670_3d3fb405113fa5e725dafd650ea20ce1.jpg/v1/fill/w_960,h_720,al_c,q_85,enc_auto/7ec670_3d3fb405113fa5e725dafd650ea20ce1.jpg)
1/7
bottom of page